Executive Summary
Sourcing electric bicycles from China requires structured supplier verification and independent factory audits to ensure production readiness, regulatory compliance, and scalable capacity.
Mila Sourcing supported a European urban mobility brand in verifying an electric bicycle manufacturer before large-scale production. Through due diligence, production capacity validation, battery supplier assessment, and quality control system review, supplier risk was reduced by 45% and production efficiency improved by 22% prior to launch.
Client Background
A European urban mobility brand preparing to launch a new electric bicycle model required a manufacturing partner in China capable of scaling to 900 units per month, meeting EU CE compliance standards, ensuring battery system safety, and maintaining consistent frame welding quality.
The company lacked on-the-ground sourcing expertise and required structured supplier verification before committing to tooling and production deposits.
Risks identified
- Unclear battery cell sourcing and compliance documentation
- Inconsistent frame welding quality across samples
- Inflated production capacity claims
- Limited transparency around subcontracted component manufacturing
- Tight timeline before market launch
Entering production without structured due diligence would have exposed the brand to delivery delays, safety risks, and potential product recalls.